Skip to main content

La Dolce Vita 2

La Dolce Vita 2

Descripción


- Engines: 45 hours of use (replaced during refit)
- Generators: 160 hours of use

All Maintenance Works Done During the Refit

Year 2018
All three hot-water boilers were replaced; all engine room lights were upgraded to new LED lighting.

Year 2021
Complete external structure repaint using Awlgrip original white color code; installation of new Humphree servo units and a new trim control system; installation of four Humphree servo units and four fins (1.5 m²) with gyroscope system; installation of AGM batteries and two Victron 100A battery chargers; new teak deck installation on the main deck; new AGM starting batteries for main engines and generators; new emergency radio bridge batteries; overhaul of all six engine room ventilation fans; overhaul of stern winches.

Year 2023
Installation of new laundry machinery including two Miele Professional dryers and two Miele Professional washing machines; installation of new kitchen equipment including a Miele Professional dishwasher, new Miele oven, induction plate, professional blast chiller, Miele combi oven and a new kitchen hood; complete replacement of external window Sica silicone; overhaul of the firefighting pump, bilge pump, sea water air-conditioning pumps, circulation air-conditioning pumps and emergency firefighting pump; complete overhaul and repainting of the swimming ladder, gangway, tender garage crane, jet-ski garage crane, hydraulic power pack units and all associated pipes.

Year 2024
Complete overhaul of the engine room; removal of both main engines (2 × MTU 16V4000M90) for full overhaul at MTU Camaga Naples with test bench verification; removal and full overhaul of both ZF 7550 gearboxes by ZF Official Coffetti Srl Padova with test bench testing; removal and overhaul of Kamewa S3 water jets by G-Jets Official Kamewa Dealer Italy; removal and installation of two new Kohler 70 kW generators with resistive load testing and upgrade of the PLC load-sharing control system; replacement of all three main switch shore lines and generator switches; replacement of generator mufflers and new exhaust manifolds; complete overhaul of all bilge sea chest valves and replacement of underwater generator cooling discharge valves; installation of new engine exhaust manifolds with a new insulation system by Cofeme Milano; overhaul of the firefighting manifold, valves and hoses; overhaul of windlass gearboxes, brakes and clutches with installation of new electric motors; painting of external tables.

Especificaciones


Año
2008
Dimensiones

Length over all              39,50 m
Length at waterline    34,46 m
Draft    1,35 m
Maximum beam          7,76 m
Beam at waterline      6,75 m
Half Load displacement        145 Tn (approx)
Full Load displacement         160 Tn (approx)
Dead-rise angle           15 gr

Propulsión

Length over all              39,50 m
Length at waterline    34,46 m
Draft    1,35 m
Maximum beam          7,76 m
Beam at waterline      6,75 m
Half Load displacement        145 Tn (approx)
Full Load displacement         160 Tn (approx)
Dead-rise angle           15 gr

Más información

¡Queremos saber de usted!

Suscríbase a nuestro boletín de noticias

  • Aviso Legal
  • Política de Cookies
  • Esta dirección de correo electrónico está siendo protegida contra los robots de spam. Necesita tener JavaScript habilitado para poder verlo.